|
PART-I
(TECHNICAL)
PART-II (PRICE-PART)
Sub:- Annual job contract (ARC) for
maintenance of Air conditioning Plants (AC Plants) for main
building, GCR, ESP-I & II and maintenance of package ACs in
co-ordination hall, library and CHP control room at TTPS,
Lalpania.
Details to be furnished by the Tender (enclose separate sheets if
required).
-
Name and Address of the firm :-
(Along with phone no. if any)
-
Name of the proprietor/ partner of
the firm :-
(Attach copy of ownership/ partnership deeds)
-
Name and qualification of the
site-in-charge :-
-
Experience in respective field :-
(Attach copy of work orders of related field)
-
Financial credibility/ capacity :-
(Attach Bank solvency certificate)
-
Annual Turn Over :-
-
Labour license no. :-
(Attach copy of registration)
-
P.F. Code No- :-
(Attach copy of registration)
-
Character certificate of the head of
the firm :-
(Issued from not below the rank of Magistrate)
-
PAN :-
(Attach copy in proof)
-
Sales Tax clearance certificate, if
any :-
-
Details of Earnest Money Deposit
Amount :-
-
Electrical License No
SCOPE OF WORK
Name of work:- A. Annual operation & maintenance
including Preventive maintenance, Breakdown maintenance and annual
overhauling of Air-conditioning Plants of 2x210MW Unit at TTPS
Lalpania.
Round the clock operation and
maintenance of the following Air conditioning Plants to maintain
the temperature of the respective area between 240C to 250C :-
-
Air conditioning plant no-I, 3x75TR
capacity for unit control room-I &II, Computer room-I & II,
Instrument Lab & SWAS room.
-
Air conditioning plant no-III, 3x60TR
capacity for Grid Control Room (GCR) and other offices.
-
Air conditioning plant no-IV, 2x25 TR
capacity for ESP control room of Unit no-I.
-
Air conditioning plant no-V, 2x25TR
capacity for ESP control room of Unit no-II.
-
Split unit Air conditioning 4x4TR
capacity for unit control room no-I & II (standby).
-
Room air conditioning, window type
6x2TR capacity for AVR room of Unit No-I & II.
-
Running maintenance, Routine
maintenance, Preventive maintenance, Breakdown Maintenance and
annual overhauling of equipments of above plants.
-
Running maintenance, Routine
maintenance, PM/BM and Annual overhauling for package ACs, 2x7TR
(Coordination Hall), 2x7TR (Library), 3x7TR (CHP control room).
-
Repair and rewinding of compressor and
gas charging of room air conditioners are not included in the
scope of work.
-
Rewinding of motors is not included in
the scope of work.
-
Consumables like refrigerant, oil
seals, V-belts, Compressor oil & spare like indicating will be
supplied by the department and the cost is not included in the
operating cost.
-
Supply of all fast moving consumables
like Petrol, diesel, Kerosene oil, Markene cloth, Cotton waste,
Soldering & Brazing materials, welding gas etc & arrangement of
all tools and tackles are included in the scope of work.
-
Overhauling of all the motors of the
under mentioned list are to be done once in a year, the spares
required for replacement during the overhauling work have to be
supplied by the department and their costs are not included in the
operation cost.
-
The cost on repair of RACs and split
unit ACs are not included in the estimate.
LIST OF EQUIPMENTS :-
|
SL. No. |
Description of
equipments |
Quantity
|
|
A. |
Air conditioning
Plant no-I UCR (3x75TR) with their electrical parts and
fresh air system |
|
|
01. |
Chiller and chiller
pumps with valves and strainers (pump fitted with 11KW, 3
phase, 415V motor) |
03Nos |
|
02. |
ACCEL make
compressors, type SMC-8-100, 75TR capacity, fitted with
75KW, 3phase, 415V motor |
03Nos |
|
03. |
Condensers and
condenser pumps with valves and strainers (pump fitted with
11KW, 3phase, 415V motor) |
03 Nos |
|
04. |
Cooling tower with
valves, water line, fans and motors |
03nos |
|
05. |
Air handling units
complete with valves piping, blower & motors |
03nos |
|
06. |
Complete
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
07. |
Cooling ducts and
grills |
LOT |
|
|
|
|
|
B. |
Air conditioning
plant no-III for GCR (3x60TR) with their electrical parts
and fresh air system |
|
|
01. |
ACCEL make
compressors type SMC-6-100, 60TR capacity, fitted with 55KW,
3phase, 415V motor |
03nos |
|
02. |
Chiller and chiller
pump with valves and strainer (pump fitted 9.3Kw, 3phase,
415V motor) |
03nos |
|
03. |
Condensers and
condenser pumps with valves and strainers (pump fitted with
9.3Kw, 3phase, 415V motor) |
03nos |
|
04. |
Cooling tower with
valves, water line, fans and motors |
03nos |
|
05. |
Air handling units
complete with valves piping, blower and motors |
03nos |
|
06. |
Complete
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
07. |
Cooling ducts and
grills |
LOT |
|
|
|
|
|
C |
Air conditioning
plant no-IV for ESP control room of unit no-I (2x25TR) with
their Electrical parts and accessories:- |
|
|
01 |
ACCEL make
compressors type SMC-6-65, 25TR capacity, fitted with 55KW,
3phase, 415V motor |
02nos |
|
02 |
Condensers and
condenser pumps with valves and strainers (pump fitted with
5.5 KW, 3phase, 415V motor) |
02nos |
|
03 |
Cooling tower with
valves, water line, fans and motors |
02nos |
|
04 |
Air handling units
complete with valves piping, blower and motors |
01no |
|
05 |
Completer
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
06 |
Cooling ducts and
grills |
LOT |
|
D. |
Air conditioning
plant no-V for ESP control room of unit I (2x25TR) with
their electrical parts and accessories |
|
|
01 |
ACCEL make
compressors type SMC-6-65, 25TR capacity, fitted with 55KW,
3phase, 415V motor |
02nos |
|
02 |
Condensers and
condenser pumps with valves and strainers (pump fitted with
5.5 KW, 3phase, 415V motor) |
02nos |
|
03 |
Clloing tower with
valves, water line, fans and motors |
02nos |
|
04 |
Air handling units
complete with valves piping, blower and motors |
01no |
|
05 |
Completer
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
06 |
Cooling ducts and
grills |
LOT |
|
E |
Room air
conditioning 2TR each fitted in AVR room of Unit no-I & II |
06nos |
|
F |
Maintenance of
package AC for Co-ordination Hall, Library & CHP control
room, 7x7TR |
07nos |
B. PREVENTIVE MAINTENANCE :-
LIST OF EQUIPMENTS :-
|
SL No |
Description of
equipments |
Quantity
|
|
A. |
Air conditioning
Plant no-I UCR (3x75TR) with their electrical parts and
fresh air system |
|
|
01. |
Chiller and chiller
pumps with valves and strainers (pump fitted with 11KW, 3
phase, 415V motor) |
03Nos |
|
02. |
ACCEL make
compressors, type SMC-8-100, 75TR capacity, fitted with
75KW, 3phase, 415V motor |
03Nos |
|
03. |
Condensers and
condenser pumps with valves and strainers (pump fitted with
11KW, 3phase, 415V motor) |
03 Nos |
|
04. |
Cooling tower with
valves, water line, fans and motors |
03nos |
|
05. |
Air handling units
complete with valves piping, blower & motors |
05nos |
|
06. |
Complete
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
07. |
Cooling ducts and
grills |
LOT |
|
|
|
|
|
B. |
Air conditioning
plant no-III for GCR (3x60TR) with their electrical parts
and fresh air system |
|
|
01. |
ACCEL make
compressors type SMC-6-100, 60TR capacity, fitted with 55KW,
3phase, 415V motor |
03nos |
|
02. |
Chiller and chiller
pump with valves and strainer (pump fitted 9.3Kw, 3phase,
415V motor) |
03nos |
|
03. |
Condensers and
condenser pumps with valves and strainers (pump fitted with
9.3Kw, 3phase, 415V motor) |
03nos |
|
04. |
Cooling tower with
valves, water line, fans and motors |
03nos |
|
05. |
Air handling units
complete with valves piping, blower and motors |
03nos |
|
06. |
Complete
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
07. |
Cooling ducts and
grills |
LOT |
|
|
|
|
|
C |
Air conditioning
plant no-IV for ESP control room of unit no-I (2x25TR) with
their Electrical parts and accessories:- |
|
|
01 |
ACCEL make
compressors type SMC-6-65, 25TR capacity, fitted with 55KW,
3phase, 415V motor |
02nos |
|
02 |
Condensers and
condenser pumps with valves and strainers (pump fitted with
5.5 KW, 3phase, 415V motor) |
02nos |
|
03 |
Cooling tower with
valves, water line, fans and motors |
02nos |
|
04 |
Air handling units
complete with valves piping, blower and motors |
01no |
|
05 |
Completer
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
06 |
Cooling ducts and
grills |
LOT |
|
D. |
Air conditioning
plant no-V for ESP control room of unit I (2x25TR) with
their electrical parts and accessories |
|
|
01 |
ACCEL make
compressors type SMC-6-65, 25TR capacity, fitted with 55KW,
3phase, 415V motor |
02nos |
|
02 |
Condensers and
condenser pumps with valves and strainers (pump fitted with
5.5 KW, 3phase, 415V motor) |
02nos |
|
03 |
Cooling tower with
valves, water line, fans and motors |
02nos |
|
04 |
Air handling units
complete with valves piping, blower and motors |
01no |
|
05 |
Completer
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
06 |
Cooling ducts and
grills |
LOT |
|
E |
Room air
conditioning 2TR each fitted in AVR room of Unit no-I & II |
06nos |
C. ANNUAL OVERHAULING :-
LIST OF EQUIPMENTS :-
|
SL No |
Description of
equipments |
Quantity
|
|
A. |
Air conditioning
Plant no-I UCR (3x75TR) with their electrical parts and
fresh air system |
|
|
01. |
Chiller and chiller
pumps with valves and strainers (pump fitted with 11KW, 3
phase, 415V motor) |
03Nos |
|
02. |
ACCEL make
compressors, type SMC-8-100, 75TR capacity, fitted with
75KW, 3phase, 415V motor |
03Nos |
|
03. |
Condensers and
condenser pumps with valves and strainers (pump fitted with
11KW, 3phase, 415V motor) |
03 Nos |
|
04. |
Cooling tower with
valves, water line, fans and motors |
03nos |
|
05. |
Air handling units
complete with valves piping, blower & motors |
05nos |
|
06. |
Complete
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
07. |
Cooling ducts and
grills |
LOT |
|
|
|
|
|
B. |
Air conditioning
plant no-III for GCR (3x60TR) with their electrical parts
and fresh air system |
|
|
01. |
ACCEL make
compressors type SMC-6-100, 60TR capacity, fitted with 55KW,
3phase, 415V motor |
03nos |
|
02. |
Chiller and chiller
pump with valves and strainer (pump fitted 9.3Kw, 3phase,
415V motor) |
03nos |
|
03. |
Condensers and
condenser pumps with valves and strainers (pump fitted with
9.3Kw, 3phase, 415V motor) |
03nos |
|
04. |
Cooling tower with
valves, water line, fans and motors |
03nos |
|
05. |
Air handling units
complete with valves piping, blower and motors |
03nos |
|
06. |
Complete
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
07. |
Cooling ducts and
grills |
LOT |
|
|
|
|
|
C |
Air conditioning
plant no-V for ESP control room of unit no-I (2x25TR) with
their Electrical parts and accessories:- |
|
|
01 |
ACCEL make
compressors type SMC-6-65, 25TR capacity, fitted with 55KW,
3phase, 415V motor |
02nos |
|
02 |
Condensers and
condenser pumps with valves and strainers (pump fitted with
5.5 KW, 3phase, 415V motor) |
02nos |
|
03 |
Cooling tower with
valves, water line, fans and motors |
02nos |
|
04 |
Air handling units
complete with valves piping, blower and motors |
01no |
|
05 |
Completer
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
06 |
Cooling ducts and
grills |
LOT |
|
D. |
Air conditioning
plant no-V for ESP control room of unit I (2x25TR) with
their electrical parts and accessories |
|
|
01 |
ACCEL make
compressors type SMC-6-65, 25TR capacity, fitted with 55KW,
3phase, 415V motor |
02nos |
|
02 |
Condensers and
condenser pumps with valves and strainers (pump fitted with
5.5 KW, 3phase, 415V motor) |
02nos |
|
03 |
Cooling tower with
valves, water line, fans and motors |
02nos |
|
04 |
Air handling units
complete with valves piping, blower and motors |
01no |
|
05 |
Completer
instrumentation annunciation and electrical system right
from incoming supply and onwards |
LOT |
|
06 |
Cooling ducts and
grills |
LOT |
|
E |
Room air
conditioning 2TR each fitted in AVR room of Unit no-I & II |
06nos |
SPECIAL TERMS AND
CONDITIONS :-
-
ENGAGEMENT OF MAN POWER- The
qualification and experience of the man-power engaged should be as
per B.O.Q. The contractor shall replace the person not found
suitable for the job by the Engineer-in-charge.
-
DEPLOYMENT OF MAN POWER-
Deployment of man- power engaged may be changed by the
Engineer-in-charge or his representative as per the requirement of
the job. No extra payment will be made by TVNL for the work beyond
normal working hours, Sundays and Holidays.
-
TOOLS AND PLANTS- The
contractor shall have to arrange tools and tackles like grease
gun, lubricating can, ladders, torches, gun-boots, hand gloves,
boxes for keeping tools, rain coat, D-spanner set, box spanner
set, Ring spanner set, slide wrench, pipe wrench, 5MT pulling
lifting machine, hammers, different sizes of files, pliers,
different sizes of screw drivers and Allen key sets etc. at their
own cost. However special tools and plants will be supplied by the
department.
-
SPARES & LUBRICANTS- All spares
and lubricants will be supplied by the department.
-
CLEANING OF WORK SITE- All the
debris, scraps, unserviceable materials and temporary scaffolding
will be removed by the contractor from the work site after the
completion of maintenance work.
-
PREMATURED TERMINATION OF THE
CONTRACT- If the performance of the contractor is not found
satisfactory, the contract may be terminated after one month’s
notice.
In case both the units are put under
shut-down for a period of more than two months the contract may be
suspended temporarily or cancelled on prior notice.
GENERAL TERMS AND
CONDITIONS
-
The tender shall be submitted in
duplicate in two parts (Part-I (Technical) and Part-II
(Commercial)).
-
The rate to be quoted in Price Part
(Part-II) shall be in figure and in words both.
-
The Tenderer must quote definite
rates. Tenders with variable rates shall be considered invalid.
The period of contract shall be normally for a period of one
year. The rate quoted by the Tenderers shall remain firm during
the entire tenure of contract agreement.
-
The quoted rate should be workable
rate.
-
The quoted rate shall be inclusive
of all fringe benefits to labourers under labour laws. Any
escalation in the rate of minimum wages or VDA or any other
allowance during the contract period will have to be borne by
the contractor.
-
Earnest money- The Tenderers are
required to deposit Earnest Money as indicated against the
tender notice in the shape of Bank Draft issued by any
Nationalized Bank in favour of “TENUGHAT VIDYUT NIGAM LIMITED”,
Payable at Ranchi. The Bank Draft must be enclosed with the
Technical Part of the tender. Tender without or with inadequate
Earnest Money will be rejected out rightly.
-
Agreement-The successful Tenderer
will have to execute an agreement in prescribed format on a
non-judicial stamp paper with concerned Electrical
Superintending Engineer within 15 days of the receipt of the
work order. The successful Tenderer is required to deposit
initial security money @5% of the ordered value before executing
the agreement. The earnest money deposited with the tender shall
be adjusted towards initial security deposit. Further 5%
security money will be deducted from the running bills of
contractor to raise the security deposit up to 10%. The entire
amount so deposited/ deducted against security deposit shall be
released after successful execution of the contract.
-
Engineer-in-charge- The concerned
Electrical Executive Engineer will be the Engineer-in- charge of
the work.
-
Paying Authority - The Accounts
officer, TTPS, Lalpania will be the paying authority.
-
Payment- The bill in triplicate will
be submitted by the contractor to the Engineer-in-charge of the
work for verification and onward transmission to the paying
authority for payment.
-
Safety- All the safety rules
prescribed for the particular job shall strictly be followed by
the contractor and safety appliances have to be provided by them
to their staff at their own cost.
-
Consumables- Consumables such as
lubricating oil, grease, bolts and nuts, gaskets, oil seals etc
will be supplied by the department free of cost, if available.
However, consumables such as Kerosene oil, cotton waste, mark-in
cloth, emery cloth paper, DA, Oxygen gas, Welding electrodes etc
will have to be supplied by the contractor at their own cost.
-
Tools and Plants - All Tools and
Plants required for the work shall be arranged by the contractor
at their own cost.
-
The contractors will have to follow
the guidelines laid under the labour laws in respect of salary
payment and other service conditions. In the event of any
accident/ casualty to the employees of the contractor, the
compensation payable to the employees shall be borne by the
contractor only and TVNL will not be responsible in any way.
-
The work shall be executed in
accordance with the specifications, drawings, designs etc. as
per direction of Engineer-in-charge for the work. In case of any
work for which there is no specification mentioned, such work
shall be carried out as per the instructions and requirements
prescribed by the Engineer-in-charge of the work. The
Engineer-in-charge may make any alteration/ addition in the
scope of work and to the specifications, drawings, designs etc,
if necessary during the progress of work and the contractor
shall have to carry out the work accordingly. Anything not
mentioned herein shall be decided by the Engineer-in-charge of
the work and shall be binding to the contractor.
-
In case of any damage to the
equipments and plants due to mishandling during maintenance by
the employee of the contractor, the damage would be made good by
them.
-
The carriage, loading and unloading
of materials to be brought at site have to be arranged by the
contractor at their own cost and no claim for the same will be
entertained.
-
facilities to be provided by TVNL :-
a) Unfurnished accommodation for office with water and
electricity inside the power house will be provided. If
available.
b) Guest house facilities shall be provided to visiting
Engineers/ officers of the contractor on chargeable basis, if
available.
c) Medical facilities to the working personnel will be provided
at TTPS Hospital to the extent it is available. No payment shall
be made for any medicine purchased for treatment outside the
hospital.
d) Unfurnished accommodations to the contractor and their
employees for the contract work shall be provided in the
township, if available on chargeable basis. Electricity supply
will also be chargeable as per tariff rates.
e) Conveyance facility for working personnel will not be
provided except in emergency calls.
f) The contractor shall be allowed to avail the facilities
available at our chemical laboratory at TTPS.
-
Any other matter not mentioned above
shall be mutually discussed and settled. In case any dispute the
decision of the General Manager cum Chief Engineer, TTPS,
Lalpania will be final.
-
Legal jurisdiction- All suits and
proceedings in connection with this contract will be under the
jurisdiction of the court at Tenughat (Bermo) in the district of
Bokaro, Jharkhand only.
-
The Tenderer should go through all
the terms and conditions and technical specifications and sign
in all the papers of the tender.
-
The Tenderer who are agreeable to
the above terms and conditions should only submit their offer.
BILL OF
QUANTITY PART-II (PRICE-PART)
NIT No-0043/E/W/TVNL/RAN/2011-12 Due on-18.11.2011
SUB:- Annual job contract (ARC) for maintenance of Air
conditioning Plants (AC Plants) for main building, GCR, ESP-I & II
and maintenance of package ACs in co-ordination hall, library and
CHP control room at TTPS, Lalpania.
*Price to be quoted as per Scope of
work given in BOQ (Technical –Part).
PART-I
Air-conditioning Plants of 2x210MW unit of Tenughat
Thermal Power Station :-
|
Sl No. |
Description
|
Qnty
|
Rate
|
Amount
|
|
A. |
Round the clock
operation of AC Plant
|
|
|
|
|
B. |
Preventive maintenance
of AC Plant
|
|
|
|
|
C. |
Annual Overhauling in
AC Plant
|
|
|
|
|
D. |
Break Down maintenance
of AC Plant
|
|
|
|
|
|
|
TOTAL
|
|
|
PART-II
Maintenance of Package Air conditioner of 2x210MW
unit at Tenughat TPS:-
|
Sl No. |
Description
|
Qnty
|
Rate
|
Amount
|
|
A. |
Preventive maintenance
of Package AC Plant
|
|
|
|
|
B. |
Breakdown maintenance
of Package AC Plant
|
|
|
|
|
C. |
Annual Overhauling of
Package AC Plant
|
|
|
|
|
|
|
TOTAL
|
|
|
|