PART-I
(TECHNICAL)
PART-II (PRICE-PART)
Sub:- Annual Job contract (ARC) for
picking of stones/ shales/Boulders/ foreign materials including
picking of usable shales and big size coal from RH-3/ raw coal
yard at TTPS, Lalpania.
Details to be furnished by the Tender (enclose separate sheets if
required).
-
Name and Address of the firm :-
(Along with phone no. if any)
-
Name of the proprietor/ partner of
the firm :-
(Attach copy of ownership/ partnership deeds)
-
Name and qualification of the
site-in-charge :-
-
Experience in respective field :-
(Attach copy of work orders of related field)
-
Financial credibility/ capacity :-
(Attach Bank solvency certificate)
-
Annual Turn Over :-
-
Labour license no. :-
(Attach copy of registration)
-
P.F. Code No- :-
(Attach copy of registration)
-
Character certificate of the head of
the firm :-
(Issued from not below the rank of Magistrate)
-
PAN :-
(Attach copy in proof)
-
Sales Tax clearance certificate, if
any :-
-
Details of Earnest Money Deposit
Amount :-
SCOPE OF WORK
Name of work:- Annual Job contract (ARC) for
picking of stones/ shales/Boulders/ foreign materials including
picking of usable shales and big size coal from RH-3/ raw coal
yard at TTPS, Lalpania
Scope of Work :-
Work to be done in General shift for
the period of one year.
Picking of stones/ shales/ mud/
foreign materials from coal in the coal yard manually.
Breaking of big size boulders/
stones/shales etc.
Removal of picking materials from the
yard to specified place as per direction of E-I.C. (near the
boundary of the coal yard for measurement purpose)
SPECIAL TERMS AND
CONDITIONS :-
-
ENGAGEMENT OF MAN POWER- The
qualification and experience of the man-power engaged should be as
per B.O.Q. The contractor shall replace the person not found
suitable for the job by the Engineer-in-charge.
-
DEPLOYMENT OF MAN POWER-
Deployment of man- power engaged may be changed by the
Engineer-in-charge or his representative as per the requirement of
the job. No extra payment will be made by TVNL for the work beyond
normal working hours, Sundays and Holidays.
-
TOOLS AND PLANTS- The
contractor shall have to arrange tools and tackles like grease
gun, lubricating can, ladders, torches, gun-boots, hand gloves,
boxes for keeping tools, rain coat, D-spanner set, box spanner
set, Ring spanner set, slide wrench, pipe wrench, 5MT pulling
lifting machine, hammers, different sizes of files, pliers,
different sizes of screw drivers and Allen key sets etc. at their
own cost. However special tools and plants will be supplied by the
department.
-
SPARES & LUBRICANTS- All spares
and lubricants will be supplied by the department.
-
CLEANING OF WORK SITE- All the
debris, scraps, unserviceable materials and temporary scaffolding
will be removed by the contractor from the work site after the
completion of maintenance work.
-
PREMATURED TERMINATION OF THE
CONTRACT- If the performance of the contractor is not found
satisfactory, the contract may be terminated after one month’s
notice.
In case both the units are put under
shut-down for a period of more than two months the contract may be
suspended temporarily or cancelled on prior notice.
GENERAL TERMS AND
CONDITIONS
-
The tender shall be submitted in
duplicate in two parts (Part-I (Technical) and Part-II
(Commercial)).
-
The rate to be quoted in Price Part
(Part-II) shall be in figure and in words both.
-
The Tenderer must quote definite
rates. Tenders with variable rates shall be considered invalid.
The period of contract shall be normally for a period of one
year. The rate quoted by the Tenderers shall remain firm during
the entire tenure of contract agreement.
-
The quoted rate should be workable
rate.
-
The quoted rate shall be inclusive
of all fringe benefits to labourers under labour laws. Any
escalation in the rate of minimum wages or VDA or any other
allowance during the contract period will have to be borne by
the contractor.
-
Earnest money- The Tenderers are
required to deposit Earnest Money as indicated against the
tender notice in the shape of Bank Draft issued by any
Nationalized Bank in favour of “TENUGHAT VIDYUT NIGAM LIMITED”,
Payable at Ranchi. The Bank Draft must be enclosed with the
Technical Part of the tender. Tender without or with inadequate
Earnest Money will be rejected out rightly.
-
Agreement-The successful Tenderer
will have to execute an agreement in prescribed format on a
non-judicial stamp paper with concerned Electrical
Superintending Engineer within 15 days of the receipt of the
work order. The successful Tenderer is required to deposit
initial security money @5% of the ordered value before executing
the agreement. The earnest money deposited with the tender shall
be adjusted towards initial security deposit. Further 5%
security money will be deducted from the running bills of
contractor to raise the security deposit up to 10%. The entire
amount so deposited/ deducted against security deposit shall be
released after successful execution of the contract.
-
Engineer-in-charge- The concerned
Electrical Executive Engineer will be the Engineer-in- charge of
the work.
-
Paying Authority - The Accounts
officer, TTPS, Lalpania will be the paying authority.
-
Payment- The bill in triplicate will
be submitted by the contractor to the Engineer-in-charge of the
work for verification and onward transmission to the paying
authority for payment.
-
Safety- All the safety rules
prescribed for the particular job shall strictly be followed by
the contractor and safety appliances have to be provided by them
to their staff at their own cost.
-
Consumables- Consumables such as
lubricating oil, grease, bolts and nuts, gaskets, oil seals etc
will be supplied by the department free of cost, if available.
However, consumables such as Kerosene oil, cotton waste, mark-in
cloth, emery cloth paper, DA, Oxygen gas, Welding electrodes etc
will have to be supplied by the contractor at their own cost.
-
Tools and Plants - All Tools and
Plants required for the work shall be arranged by the contractor
at their own cost.
-
The contractors will have to follow
the guidelines laid under the labour laws in respect of salary
payment and other service conditions. In the event of any
accident/ casualty to the employees of the contractor, the
compensation payable to the employees shall be borne by the
contractor only and TVNL will not be responsible in any way.
-
The work shall be executed in
accordance with the specifications, drawings, designs etc. as
per direction of Engineer-in-charge for the work. In case of any
work for which there is no specification mentioned, such work
shall be carried out as per the instructions and requirements
prescribed by the Engineer-in-charge of the work. The
Engineer-in-charge may make any alteration/ addition in the
scope of work and to the specifications, drawings, designs etc,
if necessary during the progress of work and the contractor
shall have to carry out the work accordingly. Anything not
mentioned herein shall be decided by the Engineer-in-charge of
the work and shall be binding to the contractor.
-
In case of any damage to the
equipments and plants due to mishandling during maintenance by
the employee of the contractor, the damage would be made good by
them.
-
The carriage, loading and unloading
of materials to be brought at site have to be arranged by the
contractor at their own cost and no claim for the same will be
entertained.
-
facilities to be provided by TVNL :-
a) Unfurnished accommodation for office with water and
electricity inside the power house will be provided. If
available.
b) Guest house facilities shall be provided to visiting
Engineers/ officers of the contractor on chargeable basis, if
available.
c) Medical facilities to the working personnel will be provided
at TTPS Hospital to the extent it is available. No payment shall
be made for any medicine purchased for treatment outside the
hospital.
d) Unfurnished accommodations to the contractor and their
employees for the contract work shall be provided in the
township, if available on chargeable basis. Electricity supply
will also be chargeable as per tariff rates.
e) Conveyance facility for working personnel will not be
provided except in emergency calls.
f) The contractor shall be allowed to avail the facilities
available at our chemical laboratory at TTPS.
-
Any other matter not mentioned above
shall be mutually discussed and settled. In case any dispute the
decision of the General Manager cum Chief Engineer, TTPS,
Lalpania will be final.
-
Legal jurisdiction- All suits and
proceedings in connection with this contract will be under the
jurisdiction of the court at Tenughat (Bermo) in the district of
Bokaro, Jharkhand only.
-
The Tenderer should go through all
the terms and conditions and technical specifications and sign
in all the papers of the tender.
-
The Tenderer who are agreeable to
the above terms and conditions should only submit their offer.
BILL OF
QUANTITY PART-II (PRICE-PART)
NIT No-0042/CHP/W/TVNL/RAN/2011-12 Due on-18.11.2011
SUB:- Annual Job contract (ARC) for picking of stones/
shales/Boulders/ foreign materials including picking of usable
shales and big size coal from RH-3/ raw coal yard at TTPS,
Lalpania.
|
Sl no |
Description of work |
Quantity (MT) |
Rate per MT (Rs.) |
Amount (Rs.) |
|
1. |
Picking of stones/ shales/
boulders and foreign materials including picking of usable
shales and big size of coal from coal at RH-3/ coal yard
|
25000 |
|
|
| |
TOTAL |
|
|
|
|