Status against Hon’ble
Commission’s Directives
5.1 Removal of Constraints
5.2 Energy Audit
5.3 Completion of MGR System
5.4 Spare Codifications and computerised maintenance
5.5 Water Chemistry
5.6 Specific Oil Consumption
6.
Petition for
2011-12
6.1 Generation Projection
6.2 Plant Availability Factor
6.3 Auxiliary Consumption
6.4 Heat Rate
6.5 Gross Calorific Value of Coal
6.6 Specific Oil Consumption
6.7 Summary
7.
Fixed
Charges
7.1 Project Cost
7.2 Elements of Fixed Costs
7.3 Interest on Loan
7.4 Depreciation
7.5 Operation and Maintenance (O&M) Expenses
7.6 Interest on Working Capital
7.7 Return on Equity
7.8 Income Tax
7.9 Secondary Fuel Consumption
7.10 Elements of Fixed Costs